Date:June 25, 2018

Kinzler Construction Services | Cedar Rapids, IA

Gas Plumbing/Heating & Furnace Install/DWV System

A newly constructed office and storage building near the Cedar Rapids Airport required a complete plumbing system installation. The 50,000 square foot facility needed a system that consisted of over 1,000 feet of high-pressure gas being delivered to thirteen individual unit heaters along with a DWV system that was equipped with two sand Interceptors, Trench Drains and future stub outs for office expansion.

The plumbing project included:

  • Thirteen individual unit heaters
  • DWV system
  • DWV system sand interceptors
  • Trench drains
  • Future stub-outs