Freddy’s Frozen Custard & Steakburgers | Cedar Rapids, IA

High-Pressure Gas System Installation

A newly constructed Freddy’s Frozen Custard on the Southwest side of Cedar Rapids was in need of a high-pressure gas system installation to accommodate the high BTU load of kitchen cooking equipment, AO Smith Cyclone Fast Recover Water Heater, and Rooftop units. The plumbing system consisted of a traditional D.W.V (drain, waste, vent) system along with an extensive grease system for all food and cooking equipment drains. The Plumbing fixtures were American Standard toilets and Urinals along with Bradley wall-hung wash fountains.

The commercial plumbing project included:

  • High-pressure gas system installation
  • American Standard toilets
  • American Standard Urinals
  • Bradley wash fountains